Harvey Gulf Upgrades PSV to "Tri-fuel" Vessel

Published

Credit: Harvey Gulf
Credit: Harvey Gulf

U.S.-based offshore vessel owner Harvey Gulf said Wednesday it completed an upgrade of its platform supply vessel Harvey Energy, making it the first "tri-fuel" PSV in the U.S.

Harvey completed the installation of a Wartsila battery-power system on the PSV which was already a dual-fuel vessel capable of fully operating on LNG or diesel.

 At the same time, Harvey said it had started operations at its new diesel bunkering facility in Port Fourchon, La., pairing it with Harvey’s LNG bunkering operations there.  

Harvey will also complete the installation of a GE battery-power system on the PSV Harvey Champion in September.

Current News

Equinor Drills Dry Well in Barents Sea

Equinor Drills Dry Well in Bar

Santos Posts 25% Profit Fall, Plans to Cut 10% of Jobs

Santos Posts 25% Profit Fall,

Suriname, Guyana Plan Cross-Border Team for Join Gas Projects

Suriname, Guyana Plan Cross-Bo

Eco Wave Power Wraps Up Feasibility Study for South Africa’s Wave Project

Eco Wave Power Wraps Up Feasib

Subscribe for OE Digital E‑News

 
Offshore Engineer Magazine