Equinor's Fire-hit Arctic LNG Plant to Resume Operations on Jan. 1

Credit: Equinor
Credit: Equinor

Equinor's Melkoeya liquefied natural gas (LNG) plant in Norway is expected to resume output on Jan. 1, 2021, after it was damaged in a fire last month, the company said in a regulatory statement on Monday.

The fire on Sept. 28 in one of the plant's electricity-generating turbines was extinguished after about six hours, Norway's Petroleum Safety Authority said at the time.

Europe's only large-scale LNG plant, near the Arctic town of Hammerfest, can process 18 million cubic meters (mcm) of gas per day, which is piped in from the offshore Snoehvit field some 160 km (100 miles) away in the Barents Sea.

After cooling the gas until it turns to liquid, it is shipped in tankers to energy markets in Europe and Asia where it is converted back to its original form before use.

The Snoehvit gas field is owned by Equinor, Petoro, Total, Neptune Energy, and Wintershall Dea. 

(Reporting by Terje Solsvik; Editing by David Clarke)



Related:

Current News

AI & Offshore Energy: The Higher the Stakes, the More Value AI Creates

AI & Offshore Energy: The High

Ulstein Verft Commences outfitting for CSOV

Ulstein Verft Commences outfit

Oil Climbs After US Crude Stocks Fall

Oil Climbs After US Crude Stoc

Windward Offshore Lines Up Key Suppliers for New CSOV Fleet

Windward Offshore Lines Up Key

Subscribe for OE Digital E‑News

Offshore Engineer Magazine