Report: SBM Offshore Only Bidder for Petrobras' Mero 4 FPSO

Illustration only; An FPSO offshore Brazil - Credit: Ranimir/AdobeStock - The image has been cropped
Illustration only; An FPSO offshore Brazil - Credit: Ranimir/AdobeStock - The image has been cropped

Brazil's state-controlled oil company Petrobras received only one proposal, from Dutch SBM Offshore, in a bid to contract construction of the Mero 4 oil platform [FPSO] in the Santos Basin pre-salt, two sources with knowledge of the matter told Reuters.

Petrobras' business plan foresees Mero 4 entering operation in 2025 with a capacity to produce 180,000 barrels of oil a day.

Petrobras and SBM declined to comment.

One of the sources commented that it is the "first time in a long time that Petrobras has received only one proposal" in a bid, a sign that the platform chartering market may no longer have as much room to absorb new demands.

In January, Petrobras held the first bid for the contracting of its own platforms in more than seven years, while seeking to diversify its suppliers of production units.

On that occasion, the company received three proposals from consortia led by Keppel Corporation Ltd, Samsung Heavy Industries Co Ltd and Daewoo Shipbuilding & Marine Engineering Co Ltd, for the construction of the P-78 and P-79 platforms.

According to previous information provided by Petrobras, the Mero field is the third-largest in the pre-salt layer and is located in the Libra area, the first to be auctioned in Brazil under production sharing in 2013.

This year, Mero will receive its first definitive production platform, according to the business plan.

The area is operated by Petrobras, with a 40% stake, in partnership with oil majors Royal Dutch Shell and Total each with a 20% stake, and 10% each held by Chinese companies CNODC and CNOOC.

 (Reporting by Marta Nogueira Editing by Marguerita Choy)


Current News

Naval Fleets power Vestdavit's record 2024 sales

Naval Fleets power Vestdavit's

China's CNOOC Aims for Record Oil and Gas Production in 2025

China's CNOOC Aims for Record

Equinor Hires BW Offshore and Altera Infrastructure for Bay du Nord FPSO Job

Equinor Hires BW Offshore and

All Set for Construction of RWE’s Offshore Wind Control Center in Germany

All Set for Construction of RW

Subscribe for OE Digital E‑News

Offshore Engineer Magazine