Keel Laid for Van Oord's Offshore Wind Turbine Installation Vessel Boreas

Credit: Van Oord (File Image)
Credit: Van Oord (File Image)

A keel laying ceremony was held Tuesday for the wind turbine installation vessel (WTIV) Boreas, being built for the Dutch marine and offshore services firm Van Oord.

The ceremony took place at the YCRO yard in Yantai, China.

The Boreas will be able to operate on methanol and will be capable of installing wind turbines of up to 20 MW capacity. 

The vessel, ordered in October 2021, will be 175 meters long and be able to lift more than 3,000 tonnes. Boreas is expected to enter the market in 2024.



Current News

Cadeler’s WTIV Newbuild Arrives to Rotterdam Ahead of Maiden Job

Cadeler’s WTIV Newbuild Arrive

LR and SHI Join Forces for Green Ammonia FPSO System

LR and SHI Join Forces for Gre

BP, Equinor, Shell and TotalEnergies Pledge $500M to Boost Energy Access

BP, Equinor, Shell and TotalEn

Seatrium Delivers Fifth Jack-Up to Borr Drilling

Seatrium Delivers Fifth Jack-U

Subscribe for OE Digital E‑News

Offshore Engineer Magazine