Keel Laid for Van Oord's Offshore Wind Turbine Installation Vessel Boreas

Published

Credit: Van Oord (File Image)
Credit: Van Oord (File Image)

A keel laying ceremony was held Tuesday for the wind turbine installation vessel (WTIV) Boreas, being built for the Dutch marine and offshore services firm Van Oord.

The ceremony took place at the YCRO yard in Yantai, China.

The Boreas will be able to operate on methanol and will be capable of installing wind turbines of up to 20 MW capacity. 

The vessel, ordered in October 2021, will be 175 meters long and be able to lift more than 3,000 tonnes. Boreas is expected to enter the market in 2024.



Current News

Ndungu Full-Field Starts Up Offshore Angola

Ndungu Full-Field Starts Up Of

Norway's 2025 Oil Output Climbs to Highest Level Since 2009

Norway's 2025 Oil Output Climb

AKOFS Offshore Inks New Vessel Deal with Petrobras

AKOFS Offshore Inks New Vessel

UK Trade Body Challenges Government View on North Sea Gas Decline

UK Trade Body Challenges Gover

Subscribe for OE Digital E‑News

 
Offshore Engineer Magazine