ST Engineering Inks Deal to Build W2W Vessel

© wanfahmy / Adobe Stock
© wanfahmy / Adobe Stock

ST Engineering has signed a shipbuilding contract for the design and construction of a Walk-to-Work (W2W) vessel for an unnamed oil and gas company.

The contracts marks ST Engineering’s expansion into the market for specialized vessels supporting offshore operations.

The W2W vessel will be 97 meters in length and able to accommodate 106 persons. 

It will feature an advanced motion-compensated gangway to ensure safe personnel transfers in varying sea conditions, and a 10-ton crane with active heave compensation for more effective load handling in rough seas.

The vessel is expected to be completed by the first half of 2027.

“Building a W2W vessel demands specialized expertise in marine engineering, advanced systems integration and dynamic positioning – areas where we excel. Being selected after a rigorous evaluation process is a testament to our expertise, dedication to quality and compliance with global standards,” said Tan Leong Peng, President, Marine, ST Engineering.

Current News

Floating Wind: Opportunities in a Vibrant, Evolving Offshore Sector

Floating Wind: Opportunities i

Israeli Firm Hires Assistance to Advance Portuguese Wave Energy Project

Israeli Firm Hires Assistance

SMD and Beam Go Deeper for AI-Driven Autonomous Offshore Wind Inspections

SMD and Beam Go Deeper for AI-

Galp Names CEO Team Following Silva’s Resignation

Galp Names CEO Team Following

Subscribe for OE Digital E‑News

Offshore Engineer Magazine