Statoil and Petrobras have completed a deal seeing Statoil acquire Petrobras’ 66% operated interest in the BM-S-8 offshore license in Brazil’s Santos basin for US$2.5 billion. BM-S-8, which Statoil estimates holds 700 MMboe to 1.3 billion boe recoverable…
A number of key contracts were awarded in 1H 2016 in Brazil, pointing to a recovery of the local oil and gas sector. The Polvo FPSO (right) while docked at Keppel FELS shipyard. Photo from Keppel…
The South American offshore market is back on the heat map, due to Exxon’s major Guyana discovery and Statoil’s interest in Brazil’s Carcará, says Rystad Energy’s Kjetil Solbraekke. Statoil took over as operator of the Peregrino field (FPSO pictured)…
UK-based engineering firm Wood Group has been awarded a multimillion dollar contract to provide detailed engineering and design, and procurement services on the development of the Peregrino field wellhead platform C, offshore Brazil. Wood…
Statoil has cut its average project cost per barrel from US$70/bbl to around $40/bbl, but the work has just started and the changes need to be permanent, even if prices increase, CEO Eldar Sætre said this morning. Speaking at the Subsea Valley conference in Oslo…
Despite the ongoing bribery investigations, Petrobras is ploughing ahead with new FPSOs. Pietro Ferreira, of the Energy Industries Council, outlines current contracting activity in Brazil and in Mexico. Ferreira…
Focus on the small South American country of Uruguay is set to sharpen after Statoil took a further stake in the country's deep offshore acreage. Statoil, which earlier this month announced it would be a partner with Total on the first deep water exploration well offshore Uruguay…
BW Offshore is a step closer to recovering the Cidade de São Mateus floating production vessel to shore for repairs more than a year after it was damaged in a fire. The fire, on 11 February 2015, offshore Brazil, saw nine of the 74 crew die and 26 require medical attention…
Statoil is to join French oil major Total in drilling the first deep water exploration well offshore Uraguay. Statoil has agreed to take a 15% stake in Block 14, a frontier block in the deep water Pelotas basin, about 200km offshore, in the the South Atlantic Ocean…
Wood Group has been chosen by Statoil to provide four-year operations and maintenance at the Peregrino field offshore Brazil. The contract covers two wellhead platforms (Alpha and Bravo) and modification services for both units and the Peregrino FPSO…
Ceragon Networks announced that Statoil, has formally awarded Ceragon Networks a five-year frame agreement, with an option to extend for five consecutive two-year periods. Most recently, Statoil has placed orders for Ceragon's IP-20 platform…
After just four years in production, the Peregrino field in the Campos basin offshore Brazil has passed a significant milestone, with 100 MMbo produced since April 2011. The field, jointly owned by Statoil and Chinese Sinochem, achieved the milestone on 2 August…
Autronica Fire and Security has announced that Statoil has selected the Autro Safe integrated fire and gas detection system for operations in the Johan Sverdrup oil field in the North Sea. As part of the four-year framework agreement…
BP has been making strides in LowSal enhanced oil recovery techniques and Bright Water. It now has its sights set on polymerized water for its Quad 204 development. Elaine Maslin found out more. Onshore…
Statoil and ExxonMobil are seeking ways to develop the multi-trillion cubic feet of gas resources they have found in Block 2 offshore Tanzania. Elaine Maslin takes a look. If you speak Swahili…