Gulf Of Mexico News

 

EXCLUSIVE: BP wins Mad Dog 2 approval

Mar 19, 2015

BP finally has filed – and won approval for – its long-awaited revised Mad Dog 2 development plan, records at the US Bureau of Ocean Energy Management show. The new plan calls for a 140,000 b/d semisubmersible floating production platform in 4440ft of water in Green Canyon block 780…

GoM lease sale reaches US$538 million

Mar 18, 2015

A total of 42 offshore companies showed up to the Central Gulf of Mexico (GoM) Lease Sale 235 that drew in more than US$538 million in high bids for exploration and development in the area. Gulf of Mexico map…

Big Foot steps towards Walker Ridge

Mar 18, 2015

Chevron’s Big Foot platform is on its way to the Walker Ridge area, offshore deepwater Gulf of Mexico. Big Foot. From Chevron.   Walker Ridge is located approximately 360km south of New Orleans…

Schlumberger releases new ultrahigh-temperature drilling technologies

Mar 18, 2015

Schlumberger launched TeleScope ICE ultrahigh-temperature measurements-while-drilling service and PowerDrive ICE ultrahigh-temperature rotary steerable system (RSS). The ultraHT-rated electronics in the…

GoM lease sale beginning

Mar 17, 2015

The Gulf of Mexico (GoM) lease sale 235 that will offer 41.2 million acres for exploration and development in the central planning area offshore Louisiana, Mississippi and Alabama begins tomorrow (18 March 2015). Secretary Jewell will…

NOIA on Central GoM lease sale 235

Mar 17, 2015

National Ocean Industries Association (NOIA) President Randall Luthi issued the following statement in advance of tomorrow’s Gulf of Mexico offshore oil and gas lease sale: 'This sale will be interesting due to low oil prices, which just dropped further this week…

BP: GoM returning to pre-Deepwater Horizon conditions

Mar 16, 2015

It’s been five years since BP’s Deepwater Horizon spill and in a new report, the company says that the GoM is returning to its baseline condition. Image of Deepwater Horizon. From USCG.   According…

Ceona inks GOM project for flagship

Mar 09, 2015

SURF contractor Ceona has secured a Letter of Intent (LOI) for the company’s newbuild flagship field development vessel, the Ceona Amazon in the US Gulf of Mexico. The contract will be the Ceona Amazon's first as well as Ceona’s first…

Paradigm Drilling establishes Mexican presence

Mar 06, 2015

Scotland’s Paradigm Drilling Services is establishing its presence in Mexico by investing an initial US$5 million into the country and creating a Mexican subsidiary, Paradigm Drilling Services Mexico. Innes…

Shell takes delivery of LNG powered supply vessel

Mar 05, 2015

Shell took delivery of an offshore supply vessel for its deepwater operations in the Gulf of Mexico (GoM), from Harvey Gulf International Marine.  The Harvey Energy is 302 ft. and operates on three dual-fuel Wärtsilä engines.  It will…

BOEM reveals August lease sale details

Mar 04, 2015

Bureau of Ocean Energy Management (BOEM) Director Abigail Ross Hopper announced the bureau will offer more than 21 million acres offshore Texas for oil and gas exploration and development in a lease sale that will include all available unleased areas in the Western Gulf of Mexico Planning Area…

EIA: Gulf of Mexico production set to grow

Mar 03, 2015

The recent downturn in oil prices is expected to have minimal direct impact on Gulf of Mexico (GOM) crude oil production through 2016 because of the long timelines associated with GOM projects, according to a new report by the US Energy Information Administration (EIA)…

Leap of faith

Mar 01, 2015

Will subsea tech join fracking slowdown? There may be too much momentum. Bruce Nichols reports. Testing for Train 2 of the Asgard subsea compression system was completed in December at Aker Solutions’ dockside yard in Egersund…

What lies beneath

Mar 01, 2015

Most of the Mexican side of the Gulf of Mexico remains unexplored. Dan McConnell explores the geotechnical knowns and unknowns in the basin. Acquiring geotechnical data for platform foundation design in Mexico’s Bay of Campeche Image from Fugro…

Intecsea to FEED Buckskin/Moccasin

Feb 26, 2015

Chevron awarded INTECSEA a contract to provide engineering and long-lead procurement services for the front-end engineering & design (FEED) phase of the Buckskin/Moccasin development in the Gulf of Mexico. Map provided by Chevron…

Current News

Makin' a List ... Trump Prioritizes Energy Exploration, Production, Export

Makin' a List ... Trump Priori

Ørsted to Shed Part of its UK Wind Farm Stake - Bloomberg News

Ørsted to Shed Part of its UK

Uncertainty Surrounds Guyana Gas Development

Uncertainty Surrounds Guyana G

Using Ocean Robots to Dive into Offshore Wind Farm Wake Effects

Using Ocean Robots to Dive int

Subscribe for OE Digital E‑News

Offshore Engineer Magazine