Saipem News

RINA acquires majority stake of SeaTech

Sep 17, 2015

Italy-based D’Appolonia, the independent engineering consulting company of RINA Group has acquired a majority stake of 68% in Fano-based SeaTech Srl. Vega A. Image from SeaTech. SeaTech provides analysis and design services…

Statoil Mariner jacket installation

Sep 15, 2015

In this video, Norwegian giant Statoil shows the installation of its largest-ever built jacket for one of its project, the Mariner project. The steel jacket for Statoil’s Mariner platform on the UK Continental Shelf has now been placed on the field…

OE15: Betting on Mozambique

Sep 10, 2015

In the race to first gas in East Africa, a clear frontrunner has emerged at the SPE Offshore Europe UKTI East African briefing yesterday, and that country is Mozambique, with huge finds and notable projects heating up. Image from Anadarko…

Designs for the future

Sep 01, 2015

Jeannie Stell speaks with classification organizations ABS and DNV GL to discuss today’s trends in new pipelay vessels. Mike Sano Bigger is better, when the object of discussion is offshore pipelay vessels…

Pipelay market outlook

Sep 01, 2015

Audrey Leon spoke with Infield Systems’ analysts James Hall and Wei Liu to get the bigger picture. According to Infield Systems, the offshore pipeline installation market over the next 12 months will be challenging. Infield has revised…

North Sea mega-Mariner jacket installed - video

Sep 01, 2015

Statoil’s largest ever steel jacket has been laid to rest on the sea bed 150km east of the Shetland Isles, marking a major milestone in the Mariner heavy oil field development.  The 22,400-tonne mariner jacket, which stands some 134m high…

Keppel O&M secures FPSO conversion and more

Aug 11, 2015

Keppel Offshore & Marine’s (Keppel O&M) wholly owned subsidiary Keppel Shipyard  has secured a floating production storage and offloading (FPSO) conversion contract as well as three repair, upgrade and modification contracts worth a total of about US$89 million (S$125 million)…

Saipem gets official South Stream axe

Jul 09, 2015

Gazprom handed Eni subsidiary Saipem a termination notice for the South Stream pipeline project to transport gas via a pipeline in the Black Sea. Image of South Stream pipelay. Images from Gazprom…

Mariner jacket moving on to North Sea

Aug 11, 2015

Statoil’s largest steel jacket in its history is on its two-week, 1835 nm journey to the North Sea after setting sail from the Spanish Dragados yard on 10 August. Mariner steel jacket sails away…

Saipem awards Alderley Kaombo FPSO contract

Jul 06, 2015

Saipem awarded Alderley a contract to design, engineer and fabricate two FPSO-produced water treatment packages for the Kaombo FPSO Project in Angola.  The project will be undertaken by Alderley Process Technologies, a subsidiary of Alderley…

Mariner marches on

Aug 05, 2015

Norwegian giant Statoil’s Mariner field in the North Sea is a US$7 billion investment for the company. It is located in Block 9/11 on the East Shetland Platform, about 150km east of the Shetland Isles, and lies in water depths ranging between 97-112m…

Aje edges toward first oil

Jul 27, 2015

Drilling has started on the Aje 5 production well in Aje field offshore Nigeria, paving the way for first oil on the floating production, storage and offloading (FPSO) vessel development. The three-phase development, starting with two production wells…

Sea Truck gets first Brazilian award

Jul 15, 2015

Sea Trucks Group has announced the recent award of its first contract in Brazil. Sea Trucks will provide accommodation support services to Saipem for 300 personnel on board, including lifting operations, storage support and logistic support services for modifications works of an FPSO…

PSA gives Statoil consent to use Scarabeo 5

Jun 26, 2015

The Petroleum Safety Authority Norway (PSA) has given Statoil consent to use the Scarabeo 5 mobile drilling facility for drilling and completing well 7121/4-G-4 H located at Snøhvit field. Scarabeo 5 is a type ME 4500 mobile drilling…

Ivar Aasen gets its steel jacket

Jun 10, 2015

Det norske installed the 8900-tonne steel jacket for its Ivar Aasen platform in the North Sea. The Ivar Aasen steel jacket. Images from Det norske. The Saipem-built jacket was lifted in place down to the seabed at 112m water depth…

Current News

Oil Edges to 2-Week High on Ukraine News

Oil Edges to 2-Week High on Uk

EMGS to Conduct CSEM Survey Offshore India

EMGS to Conduct CSEM Survey Of

Poland to Open New Areas for Offshore Wind Development in Baltic Sea

Poland to Open New Areas for O

Swedish Firm Eyes Multi-Megawatt Wave Energy Farm Off Grenada

Swedish Firm Eyes Multi-Megawa

Subscribe for OE Digital E‑News

Offshore Engineer Magazine