Saipem News

Statoil’s Valemon topsides installed

Jul 28, 2014

Topsides were lifted into place on the 9150-tonne steel jacket on the Valemon field in the Norwegian North Sea on 28 July, operator Statoil announced. Statoil's Valemon. Photo from Statoil's Andre Osmundsen…

South Stream granted go-ahead

Jul 02, 2014

The Ministry of Construction, Housing and Utilities of the Russian Federation has granted a construction permit to Amsterdam’s South Stream Transport for the South Stream gas pipeline. The pipeline will originate in Russia, pass under the Black Sea…

Saipem wins Caucasus E&C contracts

May 28, 2014

Saipem has been awarded a new engineering and construction contract in the Caucasus region and some new drilling contracts in the Middle East, for a total value of about US$750 million. In the E&C onshore sector, Saipem has been awarded by the Shah Deniz consortium…

Saipem bags more South Stream work

Apr 30, 2014

Saipem has been awarded a $US554 million contract to provide supporting works relating to the construction of the second line of the South Stream Offshore Pipeline in the Black Sea. According to Saipem, the contract includes engineering…

Ichthys hits halfway mark

Jun 25, 2014

Inpex’s Australian Ichthys LNG project has reached 50% completion less than two-and-a-half years after its final investment decision was made, the Japanese operator announced on 25 June 2014. The company said that the semisubmersible pipelay…

Valemon topside en route to Norway

Jun 16, 2014

The topside destined for the Valemon field offshore Norway was loaded onto the heavy transport vessel Dockwise Triumph at Samsung Heavy Industries in South Korea, on 1 June 2014. The 216.75m-long vessel left the Geoje yard on the morning of 15 June…

Petrobras inks Saipem contract

May 07, 2014

Brazil's Petrobras has awarded Saipem an EPCI contract for the Lula Norte, Lula Sul and Lula Extremo Sul Project, to be developed in the Santos Basin Pre-Salt region, about 300km off the coasts of the Rio de Janeiro and São Paulo States. The work scope includes engineering…

Bluewater wins Kaombo project

Jun 06, 2014

Bluewater Energy Services has been picked by Saipem to provide engineering, procurement and construction work on the turret systems on Total's two Kaombo converted floating production units, destined for offshore Angola. Bluewater will…

Global Deepwater Review: Strength in numbers

Jun 02, 2014

The Centennial J tanker will be converted by MODEC for Tullow's TEN field. Photo by: Tullow Oil Plc/Joseph Lynch. E&P companies will continue to invest in deepwater exploration and development…

CNOOC's Golden Eagle topsides underway

Jun 02, 2014

The topsides for the Golden Eagle area development (GEAD) are nearing final assembly in the UK North Sea, 43mi. (70km) northeast of Aberdeen. The project is operated by Nexen Petroleum, a wholly-owned subsidiary of CNOOC Ltd. GEAD involves three fields: Golden Eagle…

Petrobras confirms Santos find

May 22, 2014

Petrobras announced today that it has confirmed the Sagitario well discovery (formally 1-SPS-98 / 1-BRSA-1063 -SPS) initially announced 25 February 2013 while in the drilling phase. Located in the ultra-deepwater presalt area of the Santos basin…

Golden Eagle LQ sets sail

May 20, 2014

Nexen Petroleum's Golden Eagle development living quarters [LQ] module sailed away from its fabrication yard yesterday, 19 May (pictured). The LQ module was designed and built by Sembmarine SLP in Lowestoft at its Hamilton Dock. The 2000-tonne module…

Kaombo mega-contracts awarded

Apr 16, 2014

Nearly US$8 billion worth of contracts on the Kaombo mega-project offshore Angola have been announced today, following operator Total’s final investment decision on the project on Monday. An alliance between Technip and Heerema Marine Contractors has won an engineering…

OTC14: Day one roundup

May 06, 2014

Monday morning's 'New Deepwater Construction Equipment Update' highlighted multiple vessels that can be used for operational assistance. Saipem discussed the merits of theCasterone DP pipelay vessel, which has a stinger that is designed against 1500Te pipe pull…

Angola salvage will take 10 months

Apr 28, 2014

Boskalis said that salvage work to remove a capsized jackup from shallow waters near Angola's new liquefied natural gas (LNG) export plant should be completed by March 2015. The three-legged Perro Negro 6 jackup drilling rig (shown at…

Current News

Oil Edges to 2-Week High on Ukraine News

Oil Edges to 2-Week High on Uk

EMGS to Conduct CSEM Survey Offshore India

EMGS to Conduct CSEM Survey Of

Poland to Open New Areas for Offshore Wind Development in Baltic Sea

Poland to Open New Areas for O

Swedish Firm Eyes Multi-Megawatt Wave Energy Farm Off Grenada

Swedish Firm Eyes Multi-Megawa

Subscribe for OE Digital E‑News

Offshore Engineer Magazine